An Update in Pictures

At Camberwell College of Arts we often informally refer to our two sites as Peckham Road and Wilson Road. The works taking place as part of the development for Camberwell are entirely at Peckham Road and the entire site is now classified as a building site. The next stage of the works is a combination of fit out of new spaces and refurbishment of existing spaces. 

The new 3d workshop area within the new academic building is beginning to take shape as basic block walls have now been constructed. Contractors have also begun work on the link between the new library and the student centre, and re-configuring the Ceramics workshop.

 

Leave a Reply



XHTML: You can use these tags: <a href="" title=""> <abbr title=""> <acronym title=""> <b> <blockquote cite=""> <cite> <code> <del datetime=""> <em> <i> <q cite=""> <s> <strike> <strong>