Last week saw the college host  our Undergraduate and MA Conservation summer degree shows which you can read more about on our main blog. After the show closed this weekend Peckham Road entered the next stage of its development; some equipment and furniture were moved and stored within existing buildings to enable works. 

In addition to the continued fit out of spaces within the new academic building, some areas in the 1970’s building are being reconfigured and refurbished. The windows of the south side of the 1970’s lock which faces Peckham Road will also be replaced. We’ll be bringing further updates when we can throughout the summer; students should look out for the last newsletter which will be sent by our internal communications team before the end of the MA Visual Arts term.