Archive for July, 2016

Progress Update 1 August

Last week we featured a preview of how we plan to reconfigure Ceramics and the entrance at Camberwell College of Arts as part of the building development. This week’s header image (above) is the architects’ drawing of how the entrance … Continue reading

Ceramics Preview: 1970’s block

As part of the building development at Camberwell College of Arts, some spaces within the current buildings on Peckham Road will be reconfigured and refurbished.  Once such space is the Ceramics workshop in the basement level of the 1970’s block.

Progress Update & MA Visual Arts Show opens

Our MA Visual Arts students degree show opened this week at our Wilson Road site; the private view last Thursday was a great success with over a 1000 visitors attending. Meanwhile staff have relocated out of our main site at Peckham … Continue reading

Lecture Theatre Preview; new academic building

We’ve previously featured a small preview of the new lecture theatre at Camberwell College of Arts showing its subterranean location, however we are now able to share some more detailed drawings from our architects. 

Progress Update 4 July 2016

This week at Camberwell College of Arts the roof of the new academic building is due for completion. Once the roof is complete the next major stage of the building is installing windows and the distinctive glass cladding that surrounds … Continue reading